"MP 3.3 accommodation requirements" is a term that gets quoted loosely around mining camps. Before applying it to a project, get three things right: what MP 3.3 actually is, who it governs, and how long it applies. This guide explains those three points from the Queensland government's own published material — and flags the common misstatements that cost credibility with local authorities.
MP 3.3 is part of the Queensland Development Code (QDC). Its full title is MP 3.3 – Temporary Accommodation Buildings and Structures. It is a Queensland state statutory code, written and administered by the Queensland government.
Two corrections that matter. First, MP 3.3 is not a standard written by a national mining industry body. Second, it is not an Australia-wide rule. Other states — Western Australia, New South Wales, South Australia — run their own frameworks. Anyone who presents MP 3.3 as "the Australian mining accommodation standard" is wrong on both the issuer and the scope.
The Queensland government's own page describes MP 3.3 as a performance-based code: it states mandatory, objective requirements, and sets out acceptable solutions that meet them. A certified professional can approve an alternative solution if it meets the performance criteria — but there is one decision that only government makes, covered in section 4.
MP 3.3 applies to new temporary accommodation buildings, including units provided as part of an employment agreement or where rent is paid. The official Queensland page gives a direct example: temporary accommodation "such as those on mining sites." That explicit reference is why the code sits at the centre of accommodation planning for Queensland mining projects.
The practical effect for a project: if you are placing workers in temporary accommodation on a Queensland site under an employment arrangement, MP 3.3 is the framework the local authority will look at. It is not a voluntary checklist, and it is not limited to one building type.
The code sets minimum standards across the basic services a temporary dwelling needs. Summarised at framework level, they cover:
Specific quantities — fixture ratios, minimum room areas and setback distances — are set out in the code's acceptable solutions and its current version. Do not quote a number from a second-hand article. Request the current official code, confirm the version date, and apply the figures from the source document itself.
Duration is where MP 3.3 is most specific. A temporary accommodation building can remain on site for no more than two years, unless the local government approves a longer period before that two-year mark expires. Only the local government can grant that extension — a supplier or certifier cannot.
There are also two time-based thresholds that change the compliance load:
| Stage on site | What the Queensland page states |
|---|---|
| Up to 42 days | Only the parts of the code relating to time frames and basic building-code requirements apply. |
| More than 42 days | The full code applies, and an approved checklist must be completed and displayed on or near the building. |
| Beyond 2 years | Only the local government can approve the building staying longer. |
This is the practical reason camp duration must be settled at planning stage. A unit intended for a 40-day exploration program and a unit intended for a two-year mine development are not the same compliance exercise, even if the buildings are physically identical.
MP 3.3 does not tell you which building system to buy. It defines outcomes the temporary accommodation must meet. That distinction matters when you are comparing flat-pack, foldable and expandable units for a Queensland site:
For the wider planning framework around camp size and systems, see Mining Accommodation Camp: Layout, Sizing and Systems. For the temporary-versus-permanent distinction, see Temporary Site Accommodation: Types, Sizing and Delivery.
No. MP 3.3 is part of the Queensland Development Code, a Queensland state statutory code. Other Australian states have their own frameworks for temporary accommodation.
No. It is made and administered by the Queensland government. Australia's national mining body is the Minerals Council of Australia, an industry advocacy organisation that does not write building codes.
The Queensland page states no more than 2 years, unless the local government approves a longer period before the 2 years expire. Only local government can grant that extension.
Up to 42 days, only the time-frame and basic building-code parts apply. Beyond 42 days, the full code applies and an approved checklist must be completed and displayed on or near the building.
No. A specification and shop drawings are evidence for the assessment. If a building is believed not to meet the code, the relevant local government can investigate and take enforcement action.
Send your intended site duration, occupancy and layout. Wanbang can prepare a specification package and loading plan for your project to put in front of the relevant authority.